10×10 Concrete Slab Cost: 2026 Shed & Patio Calculator

Estimate a 10×10 concrete slab for a shed, patio, or spa base, with bagged-versus-ready-mix quantities, waste, and installed cost ranges.

A 10×10 concrete slab (100 sq ft) averages $900 to $1,500 installed by a contractor ($9 to $15 per square foot), or $350 to $550 if you mix and pour it yourself using bagged concrete or a small ready-mix short load. 10×10 is the most popular dimension for storage sheds, hot tub pads, garbage can pads, and backyard BBQ patios.

A 10×10 slab poured 4 inches thick contains 1.23 cubic yards before waste. With the standard 10% allowance used by this page, plan for 1.36 cubic yards, or about 82 60-lb bags or 62 80-lb bags. That quantity is close to the point where a short-load ready-mix delivery may be easier than hand mixing, so compare both options below using local prices.

Interactive Step-by-Step Calculator

Estimate your concrete slab

STEP 1 OF 4Dimensions & Presets
Popular sizes:
20 ft 20 ft
400 sq ft 4" depth • ~5.4 cu yd
Default prices last verified: August 14, 2026 Replace the defaults with a local quote when available. View public source

10×10 Concrete Slab Cost Breakdown (100 Sq Ft)

Project TypeThicknessBagged DIY CostContractor Turnkey Price
Storage Shed Foundation4 inches$380 – $500$900 – $1,400
Hot Tub / Heavy Spa Pad5 to 6 inches$520 – $700$1,200 – $1,800
Small Patio / BBQ Area4 inches (Broom)$400 – $550$1,000 – $1,500
Stamped Decorative Patio4 inches (Stamped)$650 – $900$1,400 – $2,200

Bagged Concrete vs. Ready-Mix for a 10×10 Slab

  • Bagged Concrete (60 lb Bags): About 82 bags including 10% waste. Example material cost: about $533 at $6.50 per bag, before mixer rental and delivery.
  • Bagged Concrete (80 lb Bags): About 62 bags including 10% waste. Example material cost: about $465 at $7.50 per bag.
  • Ready-Mix Delivery (1.5 cu yd): ~$250 material + $100 delivery + $150 short-load fee = ~$500 total. Delivered in 15 minutes with zero hand mixing.

Worked Quantity Check for a 10×10 Slab

The volume before waste is 10 ft × 10 ft × (4 in ÷ 12) ÷ 27 = 1.23 cu yd. Applying a 10% allowance gives 1.36 cu yd. Dividing 36.67 cubic feet by a nominal bag yield of 0.45 cubic feet (60-lb) or 0.60 cubic feet (80-lb), then rounding up, gives 82 or 62 bags. Always substitute the yield printed on the mix you plan to buy.

What Changes for a Shed, Spa, or Patio

  • Shed: Check the shed maker’s anchoring, edge-distance, and slab-size instructions before forming the pad.
  • Hot tub: Use the filled operating weight, equipment pad requirements, electrical clearances, drainage, and frost conditions—not the tub’s empty weight.
  • Patio: Plan drainage away from the house, door-sill clearance, control joints, and the final surface texture.

Frequently Asked Questions About 10×10 Slabs

How many bags of concrete do I need for a 10×10 slab?

A 4-inch-deep 10×10 slab contains 1.23 cubic yards before waste. With a 10% allowance, order approximately 82 bags of 60-lb concrete or 62 bags of 80-lb concrete. Bag yield varies by product, so confirm the yield printed on the package before buying.

How thick should a 10×10 slab be for a shed vs a hot tub?

Four inches is common for many small shed slabs. A hot-tub pad may need 5 to 6 inches and reinforcement, but the final specification depends on the filled spa weight, soil, base preparation, local code, and manufacturer instructions. Confirm the design with the spa manufacturer and a qualified local professional.

Can I pour a 10×10 concrete slab myself?

It may be manageable for an experienced DIY crew, but 62 to 82 bags is a large continuous placement. Compare mixer capacity, crew size, weather, finishing time, and short-load ready-mix charges before deciding. Concrete begins setting while later batches are still being mixed.

Related Tools

Sources and Update Policy

Figures are updated monthly from public retail and supplier pricing. The calculator’s base installed-price reference is ConcreteNetwork’s concrete price guide. Read our estimation methodology for the calculation and review process.

Prices last verified: August 14, 2026. Planning figures only. Check local building code for minimum shed foundation depth.

Estimate transparency

How this estimate was prepared

Prepared by
GoHomeCost Cost Data Team
Last reviewed
August 24, 2026
Update cycle
Public price inputs checked monthly

Calculation method: Project quantity is multiplied by editable low, typical, and high unit rates. Selected location adjustments, waste, fixed charges, and minimum-job rules are then applied and shown in the result.

Public references used on this page:

This is a planning estimate, not a quote or structural specification. Check product yields, local code, site conditions, and written contractor bids before purchasing materials or building.

Read the full methodology Report a price or calculation issue